110717 Tidal Hall Topping Out Ceremony - Texas A&M University-Corpus Christi
Faculty, staff, and students were encouraged to sign a steel beam that was placed at the top level of the Tidal Hall building. Tuesday November 7, 2017 during the Topping Out Ceremony at TAMU-CC.

Faculty, staff, and students were encouraged to sign a steel beam that was placed at the top level of the Tidal Hall building. Tuesday November 7, 2017 during the Topping Out Ceremony at TAMU-CC.

110717ToppingOutCeremony27382017Beam SigningBeamSigningCeremonyCoSEFall 2017Tidal Hall